Site VAH1
May 16, 2006
The primary mitigation work done at this site was bank regrading and riparian planting. Two rock structures were built to direct flow away from the stream banks.
|
|
|
| June 2005 | June 2005 |
A rock cross vane directs flow away from the banks and into the center of the stream. |
A constructed pool located downstream of a J-hook vane will be used to provide in-stream habitat. |